What we did
Harvest and cold stabilisation make a spiky load.
What we did
- Hour-by-hour load study across two vintages
- 640 kW of rooftop solar with storage for the press hall
- A sleeved wind contract for the winter months
The result
Electricity cost fixed for ten years, 1,180 tonnes avoided a year.



